We use cookies to provide you with a better service. Carry on browsing if you're happy with this, or find out how to manage cookies.
The Grid Code 2015 describes the technical criteria and requirements for interconnection of Small Scale Distributed Generators (SSDG) with CEB's low voltage (230/400V) network systems. The Grid Code caters for the production of electricity from the following renewable technologies:
The Grid Code 2015 addresses connection of electricity producers under the "CEB 2015 SSDG Net-Metering Scheme" for the following two categories of customers:
Read the SSDG Net Metering Grid code easily.