Feed-In Tarrif (FIT) 

Tarrif, if applicable, will be determined subject to discussion with the CEB.

For grid-connected MSDG projects designed to meet their own local consumption, a stand-by generation charge is applicable.

See General Notice No. 3011 of 2014 for more details.

General Notice No. 1397 of 2015 on the repeal of the Stand-by Generation Capacity Charge